Common flatbed freight

  • Steel coils, pipe, beams and rebar
  • Lumber and building materials
  • Machinery and equipment
  • Roofing, drywall and other construction supplies
  • Solar panels, racking and energy project materials

What we confirm before booking

  • Dimensions and weight: loads wider than 8'6", taller than legal height or heavier than legal axle weights need permits and sometimes escorts.
  • Tarps: whether the load must be tarped, which tarp size, and the tarp pay.
  • Securement: chains, straps, edge protectors and coil racks the shipper expects you to bring, in line with federal cargo securement rules.
  • Loading method: forklift, crane or side load, and how long loading usually takes.
  • Site access: job sites can have tight entries, soft ground and limited hours.

Rates that account for the work

A flatbed rate should cover more than miles. We negotiate tarp pay, detention, extra stops and oversize charges separately, so the effort you put into a heavy or complicated load shows up on the rate confirmation.

Tarping basics

Tarps protect freight from weather and road grime, and they are hard, physical work. The common types are lumber tarps for tall loads, steel tarps with shorter drops for coils and low freight, and smoke tarps that cover the front of a load. We confirm the tarp type and size before booking, so you do not show up with the wrong tarps or find out at the shipper that the load needs tarping you were never paid for.

Flatbed seasons and lanes

Flatbed demand follows construction. Spring through fall is the busy stretch across most of the country, while winter slows building in the northern states. Steel and metals move out of the Midwest and the Gulf Coast, lumber out of the Southeast and Northwest, and solar and energy projects keep the Southwest busy. We plan your weeks around where open-deck freight is moving, so you are not stuck in a market where building has paused.